top of page

MULTIPLE

ONTARIO CENTRAL

Completed 2010-2015

Solexica completed the development and construction of multiple utility-connected solar facilities on industrial rooftops across the central and eastern Greater Toronto Area between 2010 and 2015. 

Projects range in size from 150kW to 300kW each and use domestically-manufactured solar modules, aluminum racking and inverters.

bottom of page